The formulas
- Expected value = sum of (amount x probability)
- Most likely amount = the outcome with the highest probability
- Included amount = lower of the estimate and the constraint amount
How it works
ASC 606-10-32-8 requires the expected value or the most likely amount, whichever better predicts the consideration. Expected value suits many similar contracts or many possible outcomes; the most likely amount suits a binary outcome such as a bonus earned or not.
ASC 606-10-32-11 then includes variable consideration only to the extent it is probable that a significant reversal of cumulative revenue will not occur when the uncertainty resolves. Enter that ceiling in the constraint field.
Illustrative figures only. Check the result against your firm's methodology before relying on it.
Common questions
Can I switch methods each period?
No. Apply one method consistently throughout the contract for a given type of variable consideration.
Is the constraint a separate estimate?
It is a judgment on the estimate. The tool caps the estimate at the amount you conclude meets the probable threshold.
Are sales-based royalties on licenses included?
No. ASC 606-10-55-65 has an exception: recognize them when the later sale or usage occurs.
Sources
Runs in your browser. The figures you type are not sent to CORAA or stored. Check the result against your firm's methodology before relying on it.