What counts as variable
The transaction price is the consideration the entity expects to be entitled to, excluding amounts collected for third parties. Under 606-10-32-6, consideration can vary because of discounts, rebates, refunds, credits, price concessions, incentives, performance bonuses, penalties and similar items, or because entitlement depends on a future event. A right of return makes consideration variable. So does a fixed bonus paid only if a milestone is hit.
Variability can come from the entity's practice, not just the contract. If the entity has a history of granting concessions or the customer has a valid expectation of one, the price is variable even when the contract states a fixed amount.
Two estimation methods
Under 606-10-32-8, the entity uses whichever method better predicts the amount it will be entitled to:
- Expected value: the sum of probability-weighted amounts across the range. Suits a large number of contracts with similar characteristics, such as volume rebates on many customers.
- Most likely amount: the single most likely outcome. Suits a binary result, such as a bonus that is either earned or not.
The method is chosen per type of uncertainty and applied consistently through the contract. Use all reasonably available historical, current and forecast information.
The constraint
Under 606-10-32-11, the entity includes variable consideration only to the extent it is probable that a significant reversal in the amount of cumulative revenue recognized will not occur when the uncertainty is resolved. "Probable" in US GAAP means likely to occur. The test looks at both likelihood and magnitude.
606-10-32-12 lists factors that increase the likelihood or magnitude of a reversal:
- the amount is highly susceptible to factors outside the entity's influence (market volatility, third-party judgment, weather, obsolescence);
- the uncertainty will not be resolved for a long time;
- experience with similar contracts is limited or has limited predictive value;
- the entity has a practice of offering a broad range of price concessions or changing terms; and
- the contract has a large number and broad range of possible amounts.
The constraint applies to the estimate, not all-or-nothing. An entity can include the portion of a bonus that is not at risk of reversal and exclude the rest.
Exceptions and related items
- Sales-based or usage-based royalties on licenses of intellectual property follow the royalty exception in 606-10-55-65: revenue is recognized at the later of the subsequent sale or usage, or satisfaction of the related performance obligation. The general constraint is not applied to them.
- Returns. Revenue is recognized net of expected returns, with a refund liability and an asset for the right to recover products, measured at former carrying amount less expected recovery costs.
- Price concessions versus credit losses. An expected concession reduces revenue. An impairment of a receivable after the price is agreed is a credit loss under Topic 326.
Reassessment
Under 606-10-32-14, the entity updates the estimated transaction price, including the constraint, at the end of each reporting period. Changes are allocated to performance obligations on the same basis as at inception. Amounts allocated to satisfied performance obligations hit revenue in the period of the change.
What auditors look for
Variable consideration is an accounting estimate, so AU-C 540 applies. Test the data (historical rebate and return rates), the assumptions (customer volume forecasts) and the method. Compare last year's estimate with actual outcomes as a retrospective review. The variable consideration audit guide and the calculator show the mechanics.
A volume rebate across a year
Ridgeway Foods sells a product to a grocery distributor at $10 per case. If the distributor buys more than 100,000 cases in the calendar year, the price for all cases drops to $9 retroactively. Ridgeway has a long history with this customer, who has exceeded 100,000 cases in each of the last four years.
Q1: the distributor buys 30,000 cases. Ridgeway uses the most likely amount, since there are two outcomes, and concludes the distributor will exceed 100,000. Including $10 per case would create a probable significant reversal; including $9 would not. Q1 revenue: 30,000 x $9 = $270,000. Ridgeway records a $30,000 refund liability (cash billed at $10).
Q2: a major store closes and the distributor's forecast falls to 80,000 cases. Ridgeway now expects $10 per case. In Q2 it sells 20,000 cases. Revenue: 20,000 x $10 = $200,000, plus a $30,000 catch-up for Q1 cases, total $230,000. The refund liability reverses.
Conclusion: the change in estimate is recognized in the period it occurs, on the cumulative cases already delivered.
Self-check
Answer each question before you open the answer.
Which method fits a performance bonus that is either earned in full or not at all?
Show answer
The most likely amount, because there are only two possible outcomes.
What threshold does the constraint use in US GAAP?
Show answer
Variable consideration is included only to the extent it is probable that a significant reversal of cumulative revenue recognized will not occur when the uncertainty is resolved (606-10-32-11).
Does the general constraint apply to sales-based royalties on a license of intellectual property?
Show answer
No. Those follow the royalty exception: revenue is recognized at the later of the subsequent sale or usage and the satisfaction of the performance obligation to which the royalty is allocated.
Name three factors that increase the likelihood or magnitude of a reversal.
Show answer
Any three of: high susceptibility to factors outside the entity's influence; uncertainty not resolved for a long time; limited or poorly predictive experience; a practice of broad price concessions or changing terms; and a large number and broad range of possible amounts.
Use it on the file
- GuideASC 606 Variable Consideration and the Constraint: Estimation Methods and Audit Procedures
- ToolASC 606 Variable Consideration: Expected Value vs Most Likely Amount
- ToolSales Returns Reserve: Refund Liability and Return Asset (ASC 606)
Sources
Standards are paraphrased from the primary sources listed above; read the source before relying on a requirement. This lesson is training material, not professional advice. Report an error