CORAA
Internal Audit Software · India

An operating system for enterprise internal audit.

CORAA connects the audit universe, SOW, PBC list, RCM, fieldwork testing, continuous monitoring, observations, ATR and audit committee dashboard into one SIA-aligned workflow. Internal audit teams see what is scoped, what is tested, what is blocked, what has failed and what management still owes — without rebuilding the file in Excel every month.

Enterprise IA workflow

The full internal audit operating model, not just a checklist.

High-performing internal audit teams do not need another static format. They need a controlled path from audit universe to final follow-up: planning, scope, evidence, RCM, testing, monitoring, reporting and action tracking. CORAA keeps those objects connected, so a dashboard number can be traced back to the source test, evidence request, exception and reviewer conclusion behind it.

The Risk & Control Matrix

One taxonomy, every control on it.

Every engagement is built on the same structure SIA 220 and SIA 310 already expect: a process cycle breaks into sub-processes, each sub-process carries a rated risk, each risk is met by a control with a named objective, each control has a test, each test has a result, and a failed result can become an observation that flows into the report. CORAA seeds this from a pack library at engagement creation — the auditor’s confirm-or-edit is what makes a row authoritative, not the seed.

Process cycle → sub-process, mapped to how the entity actually operates
Risk, rated High / Medium / Low against that sub-process
Control, typed Preventive or Detective, and Manual / Automated / IT-dependent
Control objective, in the same assertion vocabulary as statutory testing — Existence, Validity, Occurrence, Accuracy, Completeness, Authorisation, Valuation, Compliance
Test, with pre-wired links to real Transaction Scrutiny rules and JE Analysis detectors where one exists — an honest blank where it doesn’t
Result and rating, carried straight into the report’s executive summary
Command centre and intelligence

Dashboards that explain why the number changed.

Internal audit dashboards fail when they become presentation layers disconnected from evidence. CORAA’s command-centre view is built from the same RCM rows, monitoring results, fieldwork status, observations and ATR records used in the audit file. Where Intelligence Studio is connected, reviewers can move from a high-risk KPI into money-flow, Business DNA and voucher-level context before deciding whether the signal is a control exception, a monitoring item or a false positive.

Audit universe health
Risk movement, coverage gaps, deferred reviews, capacity overload and plan-change approvals in one view.
Cycle status
P2P, O2C, R2R, H2R, cash, inventory, fixed assets, treasury, compliance and ITGC status by evidence, testing and review stage.
Exception signals
Monitoring-rule failures, source-data blockers, recurring exceptions, false-positive clearance and unresolved high-risk items.
Observation ageing
High/Medium/Low observations, due dates, revised dates, management response, closure evidence and repeat-finding status.
Audit committee pack
Plan progress, critical observations, overdue actions, scope limitations, accepted risks and private-session prompts.
Intelligence drill-down
Money-flow, Business DNA and voucher-level context from Intelligence Studio where ERP data is connected.
Explore Intelligence StudioOpen dashboard KPI dictionaryBuild dashboard pack
Nine monitorable process cycles

Every cycle a business runs on audited, not just booked.

Nine generic monitorable process cycles ship as standard. The cadences below are illustrative starting references, not fixed rules — the actual review frequency for each cycle is calibrated with the internal audit team during onboarding, the same way SIA 310 expects planning to be tailored to the entity rather than templated.

P2P
Procure-to-Pay
Duplicate or fictitious vendors, unapproved purchases, goods paid for but not received.
Weekly review · illustrative
O2C
Order-to-Cash
Unauthorised credit exposure, revenue cut-off manipulation, invoices that don’t reconcile to dispatch.
Weekly review · illustrative
R2R
Record-to-Report
Unauthorised or erroneous journal entries, period-close manipulation, unreconciled control accounts.
Monthly review · illustrative
CB
Cash & Bank
Unrecorded bank accounts, stale BRS items, unauthorised payments, misapplied receipts.
Monthly review · illustrative
H2R
Hire-to-Retire / Payroll
Ghost employees, unauthorised payroll changes, PF/ESI/PT/TDS default, unrecovered exit dues.
Monthly review · illustrative
INV
Inventory
Stock shrinkage or pilferage, obsolete stock not provided for, GRN-to-stock mismatches.
Monthly review · illustrative
TRE
Treasury
Unauthorised borrowing or investment decisions, covenant breach, idle surplus funds.
Monthly review · illustrative
FA
Fixed Assets
Unauthorised capex, misclassified revenue-vs-capital spend, wrong depreciation basis.
Quarterly review · illustrative
SC
Statutory Compliance
GST/TDS/TCS default, ROC filing gaps, related-party disclosure gaps.
Monthly review · illustrative
Cycle RCM guides

The fieldwork content, cycle by cycle.

Internal audit teams usually start with practical cycle questions: P2P checklists, R2R controls, O2C testing, payroll, cash-bank, treasury, inventory and statutory compliance RCM formats. These guides turn the product model into fieldwork content an auditor can inspect, download and reuse before moving the same structure into a live workflow.

Open the monitoring rules repository
P2P RCM
Procure-to-Pay Internal Audit Checklist
Vendor master, PO approvals, GRN, duplicate payments, GST ITC and MSME 43B(h) controls.
R2R RCM
Record-to-Report Internal Audit Checklist
Journal entries, balance-sheet reconciliations, close calendar, provisions and Schedule III mapping.
O2C RCM
Order-to-Cash Internal Audit Checklist
Customer onboarding, credit limits, dispatch, invoicing, GST, collections and receivables ageing.
Payroll RCM
Payroll Internal Audit Checklist
A focused H2R sub-guide for salary processing, PF, ESI, TDS, PT, LWF, bank file and F&F controls.
H2R RCM
Hire-to-Retire Internal Audit Checklist
The full product cycle: manpower approval, onboarding, attendance, transfers, salary changes, exits and F&F.
Cash & Bank RCM
Cash and Bank Internal Audit Checklist
Bank master, mandates, receipts, payments, BRS ageing, petty cash and cut-off controls.
Treasury RCM
Treasury Internal Audit Checklist
Borrowings, investments, covenants, bank guarantees, forex exposure and fund monitoring.
Inventory RCM
Inventory Internal Audit Checklist
GRN, stock issue, transfers, physical verification, ageing, valuation and write-off controls.
Fixed Assets RCM
Fixed Assets Internal Audit Checklist
Capex approval, CWIP, FAR, physical verification, depreciation, disposal and impairment controls.
Compliance RCM
Statutory Compliance Internal Audit Checklist
GST, TDS/TCS, ROC, payroll laws, MSME, notices and compliance calendar controls.
Practitioner downloads

Public workpapers that mirror the module.

Buyers do not need a demo to understand the file structure. The public repository exposes the same sequence the module operationalises: score the audit universe, convert it into an annual plan, scope the engagement, build the RCM, run monitoring rules, write observations and track management action. Each tool is downloadable so an auditor can test the workflow on one client before deciding what to automate.

Build file
SOW generator
Set cycle scope, cadence, exclusions, deliverables and the first data request list before fieldwork begins.
Kickoff
Kickoff pack generator
Convert approved scope into entrance-meeting agenda, stakeholder RACI, PBC commitments, escalation protocol and minutes tracker.
2026 priorities
Priority risk areas
Challenge the audit universe against cyber, AI, third-party, P2P, R2R, compliance, monitoring, treasury, H2R and closure risks.
Third-party risk
Outsourcing risk guide
Audit vendor criticality, SLA, data access, sub-outsourcing, continuity, financial health and exit-readiness controls.
AI governance
AI governance workpaper
Audit AI systems in the business with inventory, owner RACI, data/privacy controls, model change tests, human review and incident monitoring.
AI strategy
Internal audit AI strategy
Set approved IA use cases, data boundaries, governance gates, evidence rules, quality metrics and rollout ownership before AI usage spreads informally.
PBC list
Data request list
Build the cycle-wise evidence intake tracker with source report, owner, purpose, due date and status.
Evidence
Escalation tracker
Keep overdue PBC requests, evidence blockers, alternate procedures and reporting consequences visible before fieldwork review.
Risk plan
Risk scorer
Rank the audit universe using impact, likelihood, control gaps, change and compliance sensitivity.
Annual plan
Annual plan generator
Turn the risk-ranked universe into quarter-wise coverage, hours, reviewers, monitoring candidates and committee summary sheets.
Capacity
Resource capacity planner
Compare plan hours with team availability, quarter loading, specialist demand, buffer and co-sourcing gap.
Walkthrough
Walkthrough memo generator
Capture process understanding, systems, documents traced, design gaps and RCM handoff before testing starts.
Design gaps
Control gap register
Keep design deficiencies, evidence strength, RCM consequences and management actions visible before test work expands.
Ratings
Issue rating matrix
Apply consistent High/Medium/Low logic before observations move into committee reporting.
Programme
Programme generator
Assemble cycle-wise objectives, procedures, evidence, data requests, analytics and reviewer prompts before fieldwork starts.
RCM
RCM builder
Generate the cycle-wise risk, control, test, evidence and reviewer columns your team will actually use.
Sampling
Sampling plan generator
Document population, frequency, risk, sample basis, minimum sample, replacement rule and deviations before fieldwork conclusion.
Fieldwork
Testing tracker
Track RCM tests, evidence blockers, exceptions, reviewer status and report readiness during fieldwork.
Programmes
Cycle audit programmes
Open separate P2P, O2C, R2R, H2R, cash, inventory, fixed assets, treasury, compliance and ITGC fieldwork pages.
Rules
Monitoring rules
Convert duplicate payments, stale BRS items, journal spikes, leaver access and late filings into repeatable exception tests.
Reporting
Observation report generator
Draft executive summary, observation register, audit committee summary, management response and ATR-ready export sheets.
Dashboard
Dashboard pack generator
Create audit committee views for plan progress, cycle status, exceptions, observation ageing and overdue actions.
Follow-up
ATR tracker
Track observation owner, due date, revised date, closure evidence and repeat-finding status.
Workbooks
Cycle workbook hub
Open the public repository of process and industry workbooks with Excel/PDF exports.
Repository inside the module

SOW, RCM, checklist and ATR assets, turned into live workpapers.

The free public resources are useful starting points; inside CORAA, the same structure becomes a managed repository. The risk scorer ranks the audit universe, the annual plan sets quarter and reviewer coverage, the SOW starts the engagement, the control repository seeds each cycle RCM, checklist rows become assigned tests, monitoring rules run on refreshed data, observations flow into reports and action-taken tracking, and the dashboard pack gives the audit committee status without losing the underlying evidence trail. The auditor confirms or edits every row before it becomes part of the engagement record.

Scope of Work
Engagement scope, cycle coverage, cadence, reporting line, deliverables, exclusions and the first data request list.
Control repository
Reusable RCM rows by cycle: sub-process, risk, control, control objective, test procedure, evidence and result.
Checklist library
P2P, O2C, R2R, Cash & Bank, H2R, Payroll, Inventory, Fixed Assets, Treasury and Statutory Compliance programmes.
Monitoring rules
Population, data source, rule logic, cadence, exception owner, reviewer conclusion and follow-up status.
Report formats
SIA 370-style report structure with scope, work performed, observations, risk ratings and management response.
Action tracking
Observation register, management action plan, owner, due date, revised date, closure evidence and repeat finding status.
Open the control repositoryAI in internal audit guideCycle audit programmesOpen the public resource repositoryBuild annual planPlan IA capacityBuild programmeTrack fieldworkEscalate evidenceBuild dashboard packBuild the RCM
Two ways to run it

A dated report, or a live health view.

An entity’s internal audit plan can run either engagement type, or both together — a fieldwork engagement for the dated report a board or audit committee expects, and continuous process monitors for the cycles that benefit from being watched every week instead of every quarter.

Periodic · dated report
Fieldwork engagement
A fixed-period RCM review with observations and a SIA 370 report — Planning → Fieldwork → Reporting → Follow-up → Closed. Weekly, monthly, quarterly, half-yearly or annual, under one internal audit plan (SIA 220 / SIA 310).
Ongoing · live health view
Continuous process monitor
Pick a cycle, scope the controls in and out, set a cadence, start it. When refreshed data is available, the same checklist is applied on the configured sync or review cadence — no re-creation needed. A Command Centre shows clearance rate, failures, and open actions across every active monitor.
From test to report

Four ratings, one honest scale.

A control test concludes on the same four-point scale the Guidance Note on Audit of Internal Financial Controls uses, so a rating means the same thing whether an audit committee or a statutory auditor is reading it.

Effective
The control operated as designed for the period tested — no exceptions, or immaterial ones with no compensating gap.
Deficiency
A control is missing or doesn’t operate as designed, but is unlikely on its own to allow a material misstatement or loss.
Significant Deficiency
A deficiency, or combination of deficiencies, important enough to merit those charged with governance’s attention — not yet a material weakness, but close.
Material Weakness
A reasonable possibility that a material misstatement or loss won’t be prevented or detected in time. Escalates to the audit committee and, on the statutory side, threatens the Section 143(3)(i) IFC opinion.

Observations carry the five parts SIA 360/370 expect

Condition — what was actually found, with the count or sample size. Criteria — the policy, standard or law the condition falls short of. Cause — the root cause, not just “control failed.” Effect — what could go wrong because of it. Recommendation— the specific fix, addressed to a role. From a failed test, CORAA can draft this structure — condition carries the real counts from the test, the rest is a starting point the auditor edits before creating it. Management response, response owner and agreed action date fields keep the observation ready for SIA 390 follow-up and export; closure evidence still needs the firm's follow-up workflow: High → re-audit procedures, Medium → documentary evidence, Low → written management confirmation.

Reporting

A SIA 370 report, rolled up live.

Every figure in the report — controls tested, observations by rating and status, RCM summary by cycle — is a direct count over the engagement’s own RCM rows and observations, not a document assembled separately at the end. A draft view is available at any point; a final report is gated until a draft has actually been issued to the auditee, the way SIA 370 (3.3) expects. An optional AI-drafted narrative can add an executive-summary reading of those same numbers — it’s marked as a draft the auditor reviews before it goes into the issued report, and flagged stale the moment the underlying RCM or observations change.

One RCM, two audiences

Internal audit under Section 138 of the Companies Act 2013 is mandatory for a defined set of companies (by paid-up capital, turnover, borrowings, or public deposits — check applicability for the entity in question). Separately, Section 143(3)(i) requires the statutory auditor to opine on the adequacy and operating effectiveness of internal financial controls. A control tested for the Section 138 function can support management readiness and statutory-auditor coordination, but the statutory auditor’s Section 143(3)(i) conclusion still depends on independent evaluation and procedures. CORAA’s RCM engine can carry the additional Guidance Note fields (assertions, key-control flag, IPE reference, test-of-design and test-of-effectiveness results) on the same control row, instead of a second team re-documenting the same control from scratch.

Frequently asked

Before you seed the first RCM.

Internal audit software is the operating layer used to plan audits, maintain RCMs, request evidence, track fieldwork, document observations, follow up management actions and report to the audit committee. CORAA adds continuous monitoring and intelligence views so recurring exceptions do not remain hidden until the next periodic review.
CORAA Internal Audit is built primarily for enterprise internal audit teams, CAEs, CFOs, controllers and audit committees that need a controlled audit universe, RCM repository, evidence workflow, monitoring cadence and committee reporting layer. CA firms delivering outsourced internal audit use the separate CA-firm page because multi-client delivery has different operating needs.
An RCM is the structured taxonomy an internal audit engagement is built on: process cycle → sub-process → risk (rated High/Medium/Low) → control (preventive or detective, manual/automated/IT-dependent) → control objective → test → result → observation → report. CORAA seeds an entity’s RCM from a library of pre-built controls at engagement creation, then the auditor confirms or edits each row — the seed is a starting point, not the final record; the auditor’s edit always supersedes it.
CORAA’s internal audit module ships nine generic monitorable process cycles as standard — Procure-to-Pay, Order-to-Cash, Record-to-Report, Cash & Bank, Hire-to-Retire / Payroll, Fixed Assets, Inventory, Statutory Compliance, and Treasury — with cadences calibrated to the entity during onboarding rather than fixed in advance. Manufacturing, retail and ICFR packs add specialised controls on top of the generic monitorable cycles.
A fieldwork engagement is a fixed-period RCM review — Planning → Fieldwork → Reporting → Follow-up → Closed — that produces a dated SIA 370 report, the way a quarterly or annual internal audit visit works today. A continuous process monitor is scoped once per cycle (pick the controls in scope, set a review cadence) and then tests refreshed data against that checklist on the configured sync or review cadence — a live health view rather than a periodic snapshot. An engagement can use either or both; a Command Centre shows every active monitor’s clearance rate, failures, and open actions in one place.
A GRC tool usually stores risks, policies and compliance tasks. A BI dashboard usually reports management metrics. CORAA Internal Audit connects the audit file itself: audit universe, SOW, PBC list, RCM, control test, evidence, exception, observation, management response, ATR and dashboard. Intelligence Studio adds drill-down analytics, but the product remains audit-workpaper led.
Yes. Public dashboard packs help teams model plan progress, cycle status, monitoring exceptions, high observations, ageing and overdue actions. Inside the product, those dashboard fields are fed by live RCM rows, fieldwork status, observations, management responses and ATR closure evidence rather than a manually maintained presentation.
The RCM row carries the test result (Effective, Deficiency, Significant Deficiency, or Material Weakness) with the evidence it was based on. From a failed result, CORAA can draft an observation in the condition-criteria-cause-effect-recommendation structure SIA 360/370 expect — the condition carries the real counts from the test, the rest is a starting draft the auditor edits before it’s created. Nothing is recorded as a finding until the auditor explicitly saves it. The observation can carry management response, owner and agreed action date fields for review and export; fuller action-tracking workflow should be treated as a follow-up process, not assumed automatic closure.
Yes — the engagement stages, evidence handling and report structure map to the relevant SIAs in ICAI’s February 2026 compendium, applicable from 1 April 2026: SIA 220 covers overall internal audit planning and SIA 310 covers planning the internal audit assignment; SIA 320 (evidence) and SIA 330 (documentation) govern what’s recorded on each RCM row, with a preparer/reviewer trail; SIA 350 covers supervision and review; SIA 360, 370 and 390 govern management communication, reporting and follow-up respectively.
Internal audit under Section 138 of the Companies Act 2013 is mandatory for a defined set of companies (by paid-up capital, turnover, borrowings, or public deposits — check applicability for the entity in question). Separately, Section 143(3)(i) requires the statutory auditor to opine on the adequacy and operating effectiveness of internal financial controls. CORAA’s RCM engine can support management readiness and statutory-auditor coordination by carrying Guidance Note fields such as assertions, key-control flag, IPE reference and test-of-design/test-of-effectiveness results on the same control row. The statutory auditor’s conclusion still depends on independent evaluation and procedures.
No. Automation runs the tests, pulls the actual transaction population for the period, and surfaces exceptions and pre-wired counts from existing scrutiny rules — the internal auditor still investigates root cause, drafts or edits the observation, and agrees the management response. Every AI-drafted narration or observation is labelled as a draft the auditor reviews and can rewrite; nothing is finalised until the auditor’s own action.
The public templates are the open resource layer: SOW, audit universe, PBC tracker, RCM rows, cycle checklists, monitoring rules, report packs and Excel/PDF workbooks. Inside the Internal Audit module, the same structures become controlled product records with assignment, evidence, review status, exceptions, observations, management response and follow-up.
Yes. The public page content remains open for auditors, Google and AI answer engines, but Excel, PDF, calendar and file downloads should pass through CORAA standard resource forms. That keeps the resource useful for SEO while still capturing who requested the working file and which audit resource they wanted.
Start with the audit universe, risk-ranked annual plan, SOW, PBC list and RCM repository before expanding into monitoring rules and dashboards. A dashboard becomes defensible only after the underlying control owner, test procedure, evidence source, reviewer conclusion and observation workflow are clear.
Ready when you are

Internal audit, under a cadence you set.

Start with one process cycle — seed its RCM, run the first control test, and see what a live internal audit engagement actually looks like before committing to the full cycle set.

Start your first engagementSee the statutory-audit AI ModulesFor CA firms offering internal audit