CORAA

Control Remediation and Retest Log (Word)

Track a control deficiency from rating through fix to retest and closure.

Free · CORAA original — SA-aligned
Updated 17 Oct 2026
Tracks
Fix to retest
Closes on
Retest result
Open items
Assessed at period end
Format
Editable Word
Share this template
Your firm — letterhead
Appears at the top of the document as the audit firm letterhead.
Used as the letterhead block.
Engagement details
The client and period this document is for.
What’s inside

An excerpt from the template.

Control Remediation and Retest Log — ___

Scope / period: ___ | Prepared by: ___ | Reviewed by: ___ | Date: ___

Track each control deficiency from identification through the fix and the retest. A deficiency is closed only when the retest shows the control worked for a sufficient period and number of occurrences, as your methodology defines.

Open items at period end should be assessed for their effect on the overall conclusion on controls.

↑ Excerpt only — the full template is what you download as Word
About this template

What you’re downloading, and when to use it.

This template follows the format published by the Institute of Chartered Accountants of India (ICAI) in the AASB Audit Working Paper Templates (June 2023), the authoritative reference for Indian statutory-audit documentation. Fill in your firm’s letterhead and the engagement details on the form above, click Download Word file, and you’ll get a fully formatted .docx ready to use.

Everything is generated in your browser and on a stateless API endpoint — no account, nothing stored on our servers. We’ll ask for a work email once before your first download so we can send you the file and the occasional relevant update; after that, downloads on this device are instant. Edit freely in Word, Google Docs or Pages before sending to your client.

Common questions

FAQs.

When can a control deficiency be closed?
When retesting shows the remediated control operated as designed for the period and number of occurrences your methodology requires.
Related templates

You might also need.

SOX Control Deficiency Evaluation Worksheet
Generate a SOX control deficiency evaluation worksheet for severity factors, compensating controls, classifica
ICFR Testing Working Paper — Sec 143(3)(i) Format
Free ICFR testing working paper for Sec 143(3)(i) — risk-control matrix (RCM), ITGC tests, deficiency vs signi
Internal Audit Follow-up / Closure Tracker — SIA 390
Free internal audit follow-up and closure tracker template. Tracks prior observations to closure with repeat-o