Solar and Renewable Project Audit Checklist (Word)

Audit a renewable project: cost, commissioning, generation, tariff revenue, subsidies and loans.

Free · CORAA original — SA-aligned
Updated 17 Oct 2026
Covers
Cost · generation · tariff
Key date
Commissioning
Check
PPA terms
Format
Editable Word
Share this template
Your firm — letterhead
Appears at the top of the document as the audit firm letterhead.
Used as the letterhead block.
Engagement details
The client and period this document is for.
What’s inside

An excerpt from the template.

Solar and Renewable Project Audit Checklist — ___

Scope / period: ___ | Prepared by: ___ | Reviewed by: ___ | Date: ___

A working checklist for a solar or other renewable energy project. It lists what to look at, not what the law requires. Check the current tariff, subsidy, grid and tax rules that apply to the project. Check the current text of every rule that applies, and adapt the list to the entity. Record evidence seen, not only answers given.

Carry each "No" into the findings log with its effect on the financial statements or controls. Auditor: ________ | Reviewer: ________ | Date: ________

↑ Excerpt only — the full template is what you download as Word
About this template

What you’re downloading, and when to use it.

This template follows the format published by the Institute of Chartered Accountants of India (ICAI) in the AASB Audit Working Paper Templates (June 2023), the authoritative reference for Indian statutory-audit documentation. Fill in your firm’s letterhead and the engagement details on the form above, click Download Word file, and you’ll get a fully formatted .docx ready to use.

Everything is generated in your browser and on a stateless API endpoint — no account, nothing stored on our servers. We’ll ask for a work email once before your first download so we can send you the file and the occasional relevant update; after that, downloads on this device are instant. Edit freely in Word, Google Docs or Pages before sending to your client.

Common questions

FAQs.

Why does the commissioning date matter?
It decides when the asset is ready for use, when depreciation starts and when capitalised costs stop.
Related templates

You might also need.

Infrastructure / EPC Contractor Audit Checklist — Percentage of Completion
Free EPC/infrastructure contractor audit checklist — percentage-of-completion revenue computed automatically,
Energy Audit Checklist — Site Walk-Through
Generate an energy audit checklist with baseline consumption, a site walk-through by equipment area and an act
Project Cost Certificate Format — Means of Finance
Free CA-issued project cost certificate template. Project cost breakup, means of finance, variance computed. E